Project Name

Improvement of Children's Park at Ward No.2, Dhubri (Phase - I)

Amount
₹15,58,434.60
Ward Name
2
Physical Progress
100
Financial Progress
100
View on Google Map
Project Name

Const. of road from Hanuman Mandir upto connecting bye lane of Jogomaya road at ward No.I.

Amount
₹4,00,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Improvement of connecting bye lane of Raja Ram mohan roy road and A.C. Das Gupta road by C.C. paving over flat brick soling at ward No.2, Dhubri

Amount
₹2,22,739.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a protion of pucca drain backside of M.E. School oppposite to Sub-Registery office at ward No.2, Dhubri

Amount
₹1,61,611.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Vivekananda road bye lane starting from vivekananda road to Rajesh sha house vye cibst.. If guard wall at ward No.3, Dhubri

Amount
₹3,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Vivekananda road bye lane starting from Vivekananda road to Rajesh sha house and Gautam sha house by const. of 60mm thick CC block paving at ward No.3, Dhubri

Amount
₹2,80,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Supplementory estimation for drinking of water supply pipe line from over head tank at ward no.4 for 2 nos. public hydrant and const. of platform at ward No.3, Dhubri

Amount
₹20,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. Of RCC slab cover over existing drain of Rabindra sarani road at ward No.4, Dhbri

Amount
₹1,50,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of both side of pucca drain with RCC slab cover of R.K. Bose road at ward No.5, Dhubri

Amount
₹3,00,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC box culvert slab with raising brick wall and approach road with 60mm thick CC pavimg on CH paul road near Kalibari at ward No.5, Dhubri

Amount
₹1,00,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of connecting lane 2 nos. in between GTB & SM sen road by const. of 60mm thick CC block paving at ward no.6, Dhubri

Amount
₹1,00,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of GTB road bye lane by the side of Town Hotel by const. of pucca drain with CC paver block road at ward No.6

Amount
₹3,00,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of drain of Surya sen street bye lane and RCC slab cover over existing drain of Surya sen street at ward no.7, Dhubri

Amount
₹5,30,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab cover over existing drain of bata lane at ward No.7, Dhubri

Amount
₹47,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of shib shankar lane by construction of pucca drain with RCC slab over at ward No.7, Dhubri

Amount
₹2,05,852.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab cover over existing pucca drain and portion of brick guard wall of surya sen road near public bus stand at ward no.8, Dhubri

Amount
₹3,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of pucca drain with RCC slab cover of GTB road bye lane near DTO office at ward No.9, Dhubri

Amount
₹3,00,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of pucca drain with RCC slab covering starting from Nunia patty more towards A.M. Co. road switch gate (CH.0.00M upto 50.00M at ward No.10, Dhubri

Amount
₹3,00,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC drain with slab cover of Mistripatty bye lane starting from Somnath Mondal house t owards Idgah road (CH0.00M upto 95.00M) at ward No.11, Dhubri

Amount
₹4,00,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of A.M. Co. road bye lane starting from A.M.Co. road towards pranab das residence at ward No.12, Dhubri

Amount
₹4,00,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Bordoloi path bye lane raising earth filling guard wall of construction of one side pucca drain at ward no.13, Dhubri

Amount
₹1,25,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of polumongal connecting road bye lane at santinagar by raising earth filling raising brick wall ward no.13, Dhubri

Amount
₹3,29,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of santinagar bye lane raising earth filling guard wall slab covering of drain at ward No.13, Dhubri

Amount
₹1,10,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of santinagar bye lane No.1 bye raising earth filling guard wall at ward No.13, Dhubri

Amount
₹1,40,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Drain cutting at ward No.13 & ward No.14, Dhubri

Amount
₹3,00,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of R.K. Mission road bye lane bye construction of shallow pucca drain with RCC slab cover near Ghosh residence at ward No.15, Dhubri

Amount
₹1,00,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. pf Jonaki path bye lane by construction of shallow pucca drain and 60mm thick block paving near potol paul residence at ward No.15, Dhubri

Amount
₹1,66,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of bye lane by construction of shallow pucca drain and 60mm thick block paving Ajoy sharma residence at ward No.15, Dhubri

Amount
₹1,44,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of R.K. Mission road bye lane (Mazhi para) by const. of shallow pucca drain with slab cover and CC paving at ward No.16, Dhubri

Amount
₹4,00,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

POL bill

Amount
₹7,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintenance of street light

Amount
₹2,02,013.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Energy bill,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

POL bill,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintenance of street light,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Purchase of computer materials,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹66,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Installation of Solar light from ward No.1 to 16, Dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹35,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Garbage cleaning vehicle maintenance,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Improvement of road at ward No.4 & ward No. 1,Dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹2,15,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Supply of furniture of of V.C. room and construction of 5 bigha land,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹2,15,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Development of burial ground at ward No.9, Dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹1,15,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of A.K. Azad road at ward No.7, Dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹35,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

New installation of tube well at ward no.3, Dhubri, Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹20,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of over head tank at paul para water work at ward No.4, Dhubri, Under 14th Finance Commission (2nd Istallment) For the year 2015-16.

Amount
₹2,40,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of road side drain wall with RCC slab cover over of T.R. phookan road near Income tax office, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover of connecting road ib between A.C. Das gupta road & Raja Ram Moha roy road ward No.2, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,38,000.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of new RCC culvert pf rabindra sarani road near sweet Indian shop and RCC slab cover existing drain of R.S. road and Arifulla road at ward no.4, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹3,27,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Renovation of C.H. Paul road existing culvert and RCC slab cover at ward no.5, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹35,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of jackson roadside drain with RCC slab cover a portion backside of Girls Acadamy school at ward No.6, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,44,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of drain outlet of jackson road culvert at ward No.6, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,38,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab cover of both side existing drain of fakir para road bye lane and thana bye lane at ward No.7, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,00,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab cover over existing drain of road near Municipal school at ward No.7, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹70,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of A.K. Azad road side draom with RCC slab cover a portion of 40.70m at ward No.8, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹3,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of H.N. road side drain with RCC slab cover a portion of 12.70m at ward No.8, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of khandakar Itraj sah lane by const. of shallow pucca drain with RCC slab cover at ward No.10, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,00,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of station road bye lane by constl of RCC slab cover over existing drain starting from Bake house to sakila house at ward no.10, Dhbri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of station road bye lane jonaki path by construction of RCC slab cover over existing drain starting from advocate kashem house to kanu house at ward No.10, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹50,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Dr. Zakir hussain road bye lane by construction of RCC slab cover over existing drain starting from Azad club to sahanur house at war dnO.10, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹50,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of kalighat lane by construction of RCC pucca drain with slab cover at ward No.11, Dhbri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹4,00,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Bidhan pally lane by constructionof pucca drain with RCC slab cover up to chainage 42.00 phase at ward No.12, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹4,00,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of R.K. Mission road bye lane (Majhi patty) by const. of shallow pucca drain with slab cover at ward No.16, Dhubri , Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,50,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC pucca drain with slab cover near Nilima Chakraborty residence backside of BSNL office (Phase II), Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of M G Street bye lane statrting from M G Street towards uttam Deb nath residence with 60 mm thick CC paver block at ward No 1, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,50,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of M G Street bye lane (Dewan Gully) starting from M G street towards Soma Goswami residence with 40 mm thick CC paver block at ward No 1, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹57,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

(a) Contruction of road from Hanuman Mandir upto connecting bye lane of Jogamaya road (A portion) Phase II at Ward No 1,(b) Imp of Bundh cum Road by raising with filling & bamboo palasing at ward No 1 Dhubri

Amount
₹93,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of NS Road bye lane by construction of pucca drain with RCC slab cover with 40 mm thick interlocking CC block paving at Ward No 2, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,62,000.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Culvert approach road on E & D Bundh cum Road with 80 mm thick CC block at Ward No 3, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of connecting lane of Vivekananda bye lane near Mukul J B School by raising earth filling at Ward No 3, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Additional work for construction of E & D Bundh RCC culvert and wing wall with approach road by earth fillimng at Ward No 3, Dhubri , Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC Box Culvert slab and 80 mm thick CC block paver approach road with side drain renovation of Old Thakurbari at Ward No 5, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹3,00,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC slab cover (L = 9.00 m) over side drain of RK Bose Road & 80 mm thick block paver road at junction of BN at Ward No 5, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹65,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

CC paver block repairing near junction of Loan Office lane & GTB Road riad and SM Sen road at Ward No 6, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹18,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of N S Road bye lane (Gowala Patty) by construction of Shallow pucca drain with RCC slab cover and CC paving at Ward No 7, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,30,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Church Road bye lane by construction of shallow pucca drain with RCC slab cover & 60 mm thick interlocking CC block paving at Ward No 9, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹80,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of GTB Road bye lane by raising of Shallow pucca drain & 40 mm thick interlocking CC block paving at Ward No 9, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,41,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of HMM road bye lane by contruction of Shallow pucca drain & 40 mm thick interlocking CC block paving at ward No 9, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,79,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Am Co. Road bye lane near backside of TB hospital by 40 mm thick interlocking CC block paving road & with slab covering of existing drain, ward No 13, Dhubri., Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,00,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of pollymangal & connecting lane by construction of earth filling with both side bamboo palasiding, Ward No 1, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹2,00,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of I G Road bye lane by raising of earth filling with brick & RCC guard wall both side starting from Mainul Hoque house upto Hafijul Hoque house, Ward No 14, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹3,00,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of I G Road bye lane by raising of filling bamboo palasiding starting from Rezzak house upto Samsul Hoque house, Ward No 14, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Jonaki path bye lane starting from Mishra house law College road by 40 mm thick CC paver block road at ward No 15, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹4,00,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintenance of street light, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintenance of solid waste management vehicle, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,10,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintenance of street light, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

supply of RCC precast, kata tar, nail etc., Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Renovation of chariperson's office room, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹92,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of water tank at ward no.4, water works, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹20,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of over head tank at ward no.1, water works, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of connecting bye lane of vivekananda road by construction of 60mm thick interlocking CC block paver starting from Rajesh sha house to Gautam house ward No.3 phase-2, Dhubri, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹1,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Reparing of water works over head ank shad of treatment plant,10HP submerssible pump set etc. at paul para water works, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹65,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Solid waste management vehicle reparing, Under 14th Finance Commission (1st Installment) for the year 2016-17

Amount
₹35,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a portion of shallow one side pucca drain(L=88.50m) of Bele road at ward No.1,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹3,03,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of T.R. phukan road one side drain with RCC slab cover (A portion Length=46.00m) at ward No.2,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,00,000.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of connecting lane of vivekananda bye lane near Mukul JB school by construction of RCC guard wall for shallow drain at ward No. ,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,28,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC Box culvert wtih 80mm thick CC paving approach road on E&D bundh cum road at ward No.3,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹4,50,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of slab cover over shallow drain measuring length 37.00m along Arifullah road at ward No.4, Dhubri & CVharmain road Ward No.3,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹48,600.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of water supply over head tank at ward no.4,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,30,000.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of Dhanpatty road side drain with RCC slab cover and CC inerlocking paver block at the junction of Dhanpatty road and Kabar khana road at ward 5, Dhubri

Amount
₹2,05,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of R.K. Bose road culvert with RCC slab cover and approach road at ward No.5,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹3,42,175.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover starting from link road in between S.M. Sen road & GTB road(L=30.00m) at ward No.6, Dhubri(Phase-I) Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,00,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab covering over existing drain of H.N. road & N.S> road iwth brick wall raising at ward No.6,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,02,689.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with R.C.C. slab cover starting from surya sen treet towards Lt. Faizal Ali residence at surya sen street by laneWard No.7,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹93,400.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow drain(L=24.60m) of bye lane of AL faruque lane at ward No7, Dhubri

Amount
₹70,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of existing drain of Mitchel road with slab cover at ward No.7, ,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,50,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of existing drain by raiing of drain with RCC slab cover at C.R Das Road bye lane starting from Aynal Khandakar Residence towards Monowar Residence at Surya sen Street bye lane at ward no 8,,dhubri,Under 14th Finance Commission (2nd Istallment)

Amount
₹2,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Shallow Pucca drain of H.M.M Road bye lane towards Fatema Bibi residence to Hashima khatun at ward no 9,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹3,50,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Shallow Pucca drain starting from Samsuda khan residence towards the residence of Faizal Hoque Khandakar of Aftabuddin bye lane at ward no 10,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,03,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of balance portion of shallow drain ( L=64.00m) of Kali ghat lane at ward no 11, ,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹3,20,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of balance portion of shallow drain ( L=47.00m) of Mistripara lane at ward no 11,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,28,300.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Iddgah road bye lane beside Pannalal Oswal Factory up to Faizal Hoque residence by Construction of drain at ward no 11,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,80,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a portion of shallow drain (L= 24.50m) towards Kalimandir at Bahadurtary at ward no 12,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,80,500.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain near Rabindra pally road starting from Biswanath House towards upto the Length of 40.00m at ward no 12,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,00,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of R.C.C drain with slab cover from Municipal Culvert towards Ratan Dutta residence at ward no 13,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,02,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow drain without slab cover starting from College road towards Gopal dutta and Niranjan das residence College road bye lane at ward no 14,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17

Amount
₹3,96,188.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow drain without slab cover starting from College road towards Gopal dutta and Niranjan das residence College road bye lane at ward no 14,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹3,96,188.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of brick drain with RCC salb cover laying of RCC Np3/Np4/ pipe culvert for drain out water at ward no 14,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,61,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. & repairing of a portion of Guard wall ( Brick walls) of Law college road at ward no 15,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹80,315.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of Shallow Pucca drain of R.K. mission road bye lane (Natunpara) at ward no 15,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹84,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of Shallow Pucca drain with slab cover of jonaki path bye lane & approach road with 40.00mm thick interlocking C.C block paving at ward no 15,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹2,73,650.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of Shallow Pucca drain out let with RCC slab cover of Petrol tank road ( L= 5.00m) at ward no 12, ,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹65,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC Guard wall and approach road ( L=23.00) at Stadium Backside at ward no 16,,dhubri,Under 14th Finance Commission (2nd Istallment) For the year 2016-17.

Amount
₹1,33,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain of R.K. mission road bye lane starting from R.K. mission road towards Bimal Choudhury residence at ward no 16, dhubri

Amount
₹1,33,157.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain of R.K. mission road bye lane starting from R.K. mission road towards Sheman Choudhury residence and another drain starting from R.K. mission road towards Ajoy Sarkar residence at Ward no 16, dhubri

Amount
₹1,57,200.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Renovation of Water tank at ward no 01, dhubri

Amount
₹1,30,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC pucca drain Outlet with slab cover drain out stagnent water from the area of ward no 13 through I.G. road Culvert of ward no 14, dhubri

Amount
₹3,28,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Purchase of Ceaspool Machine Adroite Engineering Jorhat(Assam) for supply of Trailer mounteid 3000 Ltr. Cess Pool Clenar.

Amount
₹5,23,983.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Execavation works of katcha drain of providing of bamboo plasiding for discharge of stegnent flood at Panchughat of ward no 03, dhubri.

Amount
₹64,848.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Bandh cum road stating from Gadadhar club towards GTB road bye raiwsing earthfilling & bamboo palasiding at ward No.1, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹3,80,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of podium of Dr. Bhupen Hazarika park by const. of steps granite and tile fittend alongwith stailess steel railing and gate at GTB road beside D.C's bunglow at war No.1, DHubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹1,56,865.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. mof E&D bandh cum road by riaisng of road with earth filling palasiding etc.(Phase-I) at ward No.1, DHubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹1,20,000.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of balance portion of shallow one side pucca drain(L=22.00m) of T.R. Phukan road at ward No.2, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,12,400.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of portion of shallow one side pucca drain (L=60.00m) of A.C. Das Gupta road along office of the he PWD(RR) at ward No.2, DHubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,97,000.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a portion of shallow pucc adrain (L=41.00m) starting from charmain road towards bibekananda road at Charmain road at ward No.3, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,78,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Extension of water supply pipe line of bibekananda road (from Magistrate coloney) 1st gate to shayama Mukharjee bye lane to Kaushalya our's house at ward No.3, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹90,981.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of bebekananda road bye lane starting from bibekananda road to Rajesh sha house and Goutam saha house(Phase-4) at ward No.3, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹1,00,000.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab of connecting lane of charmain road and pound road at ward No.4, Dhubri,under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹3,61,500.00
Ward Name
4
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover of P.M. Dutta road (L=36.00m), under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹1,22,268.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC culvert of R.K. Bose road at ward No.5, Dhubri

Amount
₹4,16,500.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain wall raising with RCC slab covering of R.K. Bose road starting from culvert towards chamrain road (L=33.00m) phase-I, at ward No.5, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹84,500.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

IMp. of GTB road bye lane by the side of Town Hotel by construction of pucca drain with CC paver block road a portion Phae-2 at ward No6. Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹89,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover starting from link road in between SM sen road & GTB road (L=13.00m) phase-2 at ward NO.6, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹65,500.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC drain cum road at S.M. sen road(Bhadur babu ghat) at ward No.6, Dhubri

Amount
₹1,20,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of paver block road repairing at S.M. sen road loan office lane at ward No.6, Dhubri

Amount
₹1,72,125.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a portion of CC road paving of S.M. sen road bye lane towards near B.P. loadge at S.M. Sen road at ward No.6, Dhubri

Amount
₹32,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of fencing grill at back side of Netaji subhash Chandra Bose statue at panchmore at ward No.6, DHubri

Amount
₹22,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain of Surya sen street (L=61.00m) at ward No.7, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹2,79,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

IMp. of A.K. Azad road bye lane starting from A.K. Azad road towards Neha house at ward No.7, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹84,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of C.R> Das road bye lane starting from C.R. Das towards Maju Hussain residence at ward No.7, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.Q

Amount
₹50,200.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of C.R. Das road bye lane with drain & RCC slab cover starting from shakti Brahma residence to Bishny Brahma residence at ward No.7, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹94,950.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Raising of culvert at N.S. Road (Near Bata shop) and const. of approach culvert with 80mm thick CC block at ward No.7, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹1,70,294.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shalow pucca drain (L=30.00m) of Dr. Zakir Hussain road bye lane at ward No.8, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹2,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Harizon Coloney by const. of shallow pucca drain CC raod paving & stairs for a approach towards river Gadadhar at Ward No.9, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹3,50,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover (L=35.00m) from station road towards Nitu house at tation road at ward No.9, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹1,24,500.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC NP3/NP4 pipe culvert for drain out water and approach road of culvert at Ward No.10, Dhubri under 14th FC (2nd Instl.) for the year 2017- 18.

Amount
₹2,00,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. shallow pucca drain with RCC slab cover (L=25.00m) of Bahadurtari road bye lane starting from Goutam Choudhury residnece towards Bahadur tari bye lane at ward No.11, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹1,66,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of a portion of shallow pucca drain lwith RCC slab cover (L=13.00m) of Dr. Zakir Hussain road bye lane towards Dilip singh residence at Ward No.11, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹68,600.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of A.M. Co. road bye lane (Gowalapaty) towards Saran Agarwala(L=15.00m) by 40mm thick CC paver block at ward No.11, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹57,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover and 40mm thick CC block paving road at ward No.11, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,06,663.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Bhadra para bye lane by const. of RCC guard wall earth filling starting from Basudeb paul residence upto Ratan Das residence for a length of 28.00m at ward No.12, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹4,98,250.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of RCC gurad wall cover slab cross tie RCC culvert earth filling the along santinagar main road at ward No.13, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,68,500.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Supply of LED light, wire,pendent holder etc. under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,30,500.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Haque Nagar by const. of guard wall & 40mm thick CC bock paving(L=101.00m) at ward No.14, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,00,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

IMp. of College road bye lane infront of Pari Mandir gate by const. of shallow pucca drain & spreading of earth filling & sand gravel laying on road at ward No.15, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,75,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of College road bye lane infront of Pari Mandir bye const. of shallow pucca drain at ward No.15, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,25,100.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of R.K.Mission road bye lane by CC paving starting from R.K. Mission road towards Akon sarkar residence at ward No.16, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹3,21,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover of station road bye lane sen para near sujoy Dutta residence(L=61.00m) at Ward No.16, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹3,21,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Repairing of tripper for solid waste management purpose under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹87,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Purchase of street light under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹2,50,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC paving along Railway ditch at Gauriya patty stating from Satyabrata Mazumdar towards Railway abadaned quarter at Ward No.13, Dhubri under 14th FC (1st Instl.) for the year 2017- 18.

Amount
₹5,00,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC drain(L=22.00m) with 600mmx750mm(Inner) with RCC slab at Bibekananda road bye lane towards Hanumand Mandir near Tripat Chakraborty residence at Ward No.1, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,08,076.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC culvert with approach roads of Bibekananda road bye lane towards Hanuman mandir near Tripad Chakraborty, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹3,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering of A.C. Das Gupta road(L=90.00m), Under 14th FC 2nd Installment for the year 2017-18

Amount
₹4,95,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC drain (L=105.00m) with 600mmx750mm (inner) with RCC slab at Bibekananda road, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹9,83,159.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering and 40mm thick CC block paving of Rabindra Sarani bye lane(L=48.00mm), Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC NP3/PN4 pipe culvert on charmain road for draining out water from Ward No.3 connecting to Old Thakurbari road drain at Ward No.5, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,01,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering of R.KBose road starting from from culvert towards charmain road(L=22.00mm) at ward No.5, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹55,500.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC slab covering of Old Thakur bari road existing drain opposite Jawahar Hindi High School(L=25.00m) at ward No.5, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹47,000.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of New collapsible gates & Raolling shutters(4 nos.) of Lainey Market at ward No.5, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,76,500.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain withy RCC slab cover starting from link road in between S.M. sen road & GTB road (L=24.00m) phase 3, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,25,690.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab cover from GTB road towards Late Khoka Mandal residence near Town hotel Dhuri(L=90.00m) at ward No.6, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,95,500.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Alfaruque bye lane (Fakirpara) starting from (1) Jamirul Haque residence to snajay residence (2) from Moon Hussain reidence to Zakir Hussain residence wtih 40mm thick CC paver block at Ward No.7, Dhubri,

Amount
₹93,483.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of C.R. Das road bye lane starting from Mosarafuddin residence to Lt. Ekramuddin residence with 40mm thick CC paver block at ward nO.7, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹44,150.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp.of Alfaruque road( Fakirpara road towards Abdl Salam residence by raising of existing drain wall and CC paving road at ward No.7, Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹30,000.00
Ward Name
7
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of Zakir Hussain road bye lane by raising existing drain wall with RCC slab cover & 40mm thick CC block paving road at ward No.8, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹3,00,000.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering of station road bye lane starting fromk Nitu House towards Amir Hussain residence (L=27.00m) phase-2, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹78,500.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering of 40mm thick CC block having of station road bye lanestarting from station road towards anil parsad residence (L+4500M) ward no 9

Amount
₹1,47,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with RCC slab covering of 40mm thick CC block having of GTB Road bye lane starting from GTB road towards Ratan Kr Ghosh residence ward no 9, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹85,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of GTB road bye lane stating from GTB Road towards Rajesh Mahato residence by constitution of 40mm thick C.C have block road (L+19.00M) Ward No 9

Amount
₹43,000.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. of station Road bye lane by Const of C.C shallow pucca drain with slab upto chainage of + 90.00 M, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹4,47,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Khandakar Entry shah lane by 60mm thick interlocking C.C haveer block and brick wall raising at warn no 10 phase-3 wno 10, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,09,927.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with R.C.C slab cover of Kumar patty bye lanestarting from kumar patty bye lane towards jahar prasad shing residence (L=46.00M) W No 10

Amount
₹4,21,000.00
Ward Name
10
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain with R.C.C slab cover of cannecting lane in between Dr. Zakir Hussain Road of Bahadurtari road (L= 83.00M) w no 11, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹4,97,000.00
Ward Name
11
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of rabindra pally bye lane (Charak puja Golly) starting from Rabindra pally towards Tanuja Paul Residence by const of R.C.C gyardwall & earth filling (L=71.00m) W no 12, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹40,00,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of shallow pucca drain (L=39.000M) of Rabindra Pally bye lane (ch400m to 79.00m) w no 12, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,04,000.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Santinagar Main road extension by 40mm thick C.C Block having road (L=25.00M) wno 13, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,69,438.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of T.B Hospital back side bye lane 1) R.C.C gaurd wall sight crack filling towards Dilip kundu residence 2)C.C gaurd wall 40 mm thick C.C block having road towards Babul Paul residence 3) R.C.C slab cover existing drain w no 13

Amount
₹1,59,840.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of cannecting lane starting from railgumti bye lane towards T.B Hospital back side bye lane with 40.mm thick R.CC block having road (L=37.00M) W no 13

Amount
₹1,15,732.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

imp of Bordoloi Path drain byconst of C.C drain bed (L=321.00M) & Const Of R.C.C drain wall a portion (56.00m), Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,55,550.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of connecting lane in between sankardev lane of Natun para bye lane (L=174.00M) by raising pucca darain wall (A portion) L= 93.30M & const of New Shallow pucca drain (A-portion L= 80.50M) and Crossing Drain with R.C.C Slab of earth filling. Wno 15,

Amount
₹3,15,415.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of connecting lanein collage nagar road & Law collage ahyam road (L=46.00M) by const of R.C.C shallow pucca drain with slab covering (a-portion) Wno 15

Amount
₹2,01,500.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Horizon colony near garikhana Road by const of 100mm thick C.C paving C.Cslab from wno 16, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹27,500.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

const of shallow pucca drain with R.C.C slab cover of railway line para (L=61.00M) wno 16, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹2,25,000.00
Ward Name
16
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

const of R.C.C having along Railway ditach at Goriya Patty Starting from Satyabrata Mazumdar towards Railay abandamed Quter No 13. Dhubri, Under 14th FC 2nd Installment for the year 2017-18

Amount
₹1,52,465.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const of Dhubri Municipal vechile garage vechile washing center w no 2 ., Under 14th FC 2nd Installment for the year 2017-18

Amount
₹4,77,264.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for a list containing 1270nos of benificiaries for one time assistane of Rs 1000/- hispoor family.Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹12,70,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for supply of M.S pipe Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹768.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for painting cost flex banner Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹13,577.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for supply of T. iron H clamp Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹1,296.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for supply of batary spry Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹4,029.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for supply of 20.mm elbow etc. Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹3,500.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

for making cost of sanitigation chamber stand Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹3,500.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

SUpply of PVc pipe Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹3,300.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for a list containing 714 nos. of beneficiaries for one time assistance of Rs.1000/- poor family Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹7,14,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for new febrication and installation of swice gate at culvert at Rail Gumty at ward No.12,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹2,12,256.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for fconst. of Natural channel drain outlet by sand filling bag pitching bothside to protection earth for drain out stagnent water at ward No.12, Dhubri Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹93,315.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for const. of Natural channel drain out let by excavation with both side bamboo palasiding and supply of empty plastic bag for drain out stagnent water at ward No.12, Dhubri Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹4,51,514.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Supply of Mask home mad face mask Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹5,83,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of load bearing culvert measuring length 7.20m at charmain road near Jugal Kishor Akhara at Ward No.3, Dhubri Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹4,72,116.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of load bearing culvert (L=10.5m at Dr. Zakir Hussain road at Ward No.8, Dhubri,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹6,58,808.00
Ward Name
8
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const. of RCC drain (L=165.00m) along bibekananda road from charmain road upto Magistrate coloney at Ward No.3,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹29,76,270.00
Ward Name
3
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

const of R.C.C drain (L=105.00) along Thakurbari lane starting from collage road towards Gautam Sikdar residence at Wno 14,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹7,03,500.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Constof R.C.C drain (L=240.00mm) with 1 (one) no culvert messering lengh 9.50 mm along T.R phukan from 0/0 Income tax towards main Channal & s portion of P.M Dutta Road at Wno 2,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹48,09,711.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const of R.C.C drain (L=130.00M) of Railway Ditach guard colony at Wno 12 ,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹3,27,522.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

supply of electrial goods,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹93,720.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Supply of LED bulb Holder Aliminium wive and balck tape,Under 14th Finance Commission (1st Installment) for the year 2018-19

Amount
₹1,02,305.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp old Thakurbari road stating from Dhanpatty road upto Charmain Road (L=158.00m)with 80mm thick C.C have block at w no 5 Dhubri With 80mm thick mile loking C.C paver black under 14th F.C for 2018-19 (2nd installment)

Amount
₹17,98,400.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of C.H Paul road starting from Dhanpatty Road upto Charmain road (L=150.00mm) with 80mm thick C.C paver block at w no 5 Dhubri With 80mm thickinterlocking C.C paver block under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹17,20,250.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of R.K Bose Road Starting from Dhanpatty Road upto chairman Road (L=135.00M) with 80mm thick C.C paver Block at ward no 5 dhubri with 80mm Thick interlocking C.C paver block under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹16,73,700.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of balance portion of T.R Phukan Road starting from Ranjan Biri residence towards swami Vivekanada statue towards charmain road wno 1 Dhubri (L=308.00m) with 60mm thick interlocking C.C paver block under 14th F.C for the year 2018-19

Amount
₹24,13,100.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of a portion of Thakurbari road towards south collage nagar road at ward no 14 Dhubri (L=225.00)with 60mm thick interlocking C.C pever block under 14th F.C fund fro the year 2018-19 (2nd installment)

Amount
₹8,59,500.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of a balance portion of Law collage road starting from 1) Khalilpur Road towards Gonochabukprinting press (L=207.00m) at ward no 15 WITH 60MM THICK INTERLOCKING .c PAVER BLOCK UNDER 14TH f.C fund for the 2018-19 (2nd installment)

Amount
₹8,65,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of santinagar bye lane starting from railway towards Charitra Das residence wno 13 under 14th F.C fund for 2018-19 (2nd Installment)

Amount
₹2,00,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of Swahid Kanaklata Path bye lane (Rabindra Pally) from Swahid Kanaklata path towards Kalyani Paul residance at Wa no 12 dhubri under 14th F.C for 2018-19 (2nd Installment)

Amount
₹3,87,150.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of a Subash Nagar bye lane starting fromn Topu Mallick residance to kartik Kundu residance (L=50.00m) at w no 12 under 14th F.C for 2018-19 (2nd installment)

Amount
₹3,87,468.00
Ward Name
12
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of boundary wall at Municipal quater (L=26.00m) ward no 5 Dhubri under 14th F.C fund for year 2018-19 (2nd installment)

Amount
₹1,06,500.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Renovation Work of Lainey Market W no 5 dhubri under 14th F.C fund for year 2018-19 (2nd installment)

Amount
₹2,00,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

construntion of R.C.C load bearing drain cum Foothpath (L=156.00m) along connecting ROAD aLong with 1 (one) no culvert measuring length 8.50M under 14TH F.C 2018-19 (2nd installment)

Amount
₹33,81,200.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const of R.C.C Drain ourlet with slab cover at SM Sen Road starting from S.M Sen Road towards River Gadadhar (L=51.00m) under 14th F.C for 2018-19 (2nd installment) wno 1

Amount
₹8,91,786.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Maintance of Solid Waste Carring Vechile & hand full cart.under 14th F.C fund for year 2018-19 (2nd installment)

Amount
₹3,23,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Bill for Supply of LED lights under 14th F.C fund for 2018-19 (2nd installment)

Amount
₹3,16,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Engagment of Labour of materials for discharge of artificial flood with of South Collage road Wno 14,under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹1,48,000.00
Ward Name
14
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Const of a balance portion of road side darin wall (One Side) with R.C.C slab cover (L-18.30m) of A,C das gupta road more o/oe engi P.W D (RR) at wno 2,under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹2,18,049.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imph of R.K Mission Road bye lane const of R.C.c shallow fund drain with slab cover (A portion) & raising by earth filling starting from pradip Mahanta residence towards ghosh residence at ward no 15,under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹20,00,000.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Engagement Supply of of skilled drain cutting labour manuaaly,under 14th F.C for the year 2018-19 (2nd Installment)

Amount
₹4,38,000.00
Ward Name
n/a
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Erection of Clock Tower at PWD More, Ward No 1, Dhubri

Amount
₹22,94,060.00
Ward Name
1
Physical Progress
100
Financial Progress
40
View on Google Map
Project Name

Construction of Vice Chairperson room & toilet block of Dhubri Municipal Board, Ward No.1, Dhubri Under 15th Finance Commission ( Untied ) for the year 2021-2022 (2nd Installment) during the FY 2022-23

Amount
₹15,15,047.00
Ward Name
1
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp. Of Kabarsthan Road starting from N.S. Road upto B.N. Bose Road ( Ch. With 80mm thick CC paver block at Ward No.5, Dhubri, Phase-II Under 15th Finance Commission ( Untied ) for the year 2021-2022 (2nd Installment) during the FY 2022-23

Amount
₹8,47,722.00
Ward Name
5
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of a balance portion RCC covered drain ( L=34.00M ) along AMCo. Road at Ward No.13, Dhubri Under 15th Finance Commission ( Untied ) for the year 2021-2022 (2nd Installment) during the FY 2022-23

Amount
₹4,40,000.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC culvert at link road of Charmain Road & T.R. Phukan Road at Main Channel near Bikramjit Karmakar residence, Ward No.2, Dhubri Under 15th Finance Commission ( Untied ) for the year 2021-2022 (2nd Installment) during the FY 2022-23

Amount
₹3,70,938.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of storm water drain (L = 89.00 m) at Pollymangol, santinagar, Ward No 13, Dhubri under 15th FC Untied General basic grant for the year 2022-23 (1st Inst.) for the year 2023-24

Amount
₹7,91,459.00
Ward Name
13
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC drain with slab cover (L = 40.00 m) connecting to existing Municipal drain backside of Law college at ward No 15, Dhubri under 15th FC Untied General basic grant for the year 2021-22 (2nd Instl.) during the year 2022-23.

Amount
₹2,67,501.00
Ward Name
15
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of RCC drain with slab cover (L = 42.00 m), cross drain & with widening of road of Loan Office at ward No 6, Dhubri under 15th FC Untied General basic for the year 2021-22 (2nd Inst.) during the year 2022-23.

Amount
₹5,23,945.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of Community toilet block at Garikhana Road at Ward No 9, Dhubri under 15th FC Untied General basic Grant for the year 2021-22 (1st Instl.) during the year 2023-24

Amount
₹8,91,239.00
Ward Name
9
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Imp of Children's Park at ward No 2, Dhubri (Phase - II)n under 2nd inst. of Untied Grant (Last part) of 15th FC for the year 2021-22 during the FY 2021-22

Amount
₹17,36,863.00
Ward Name
2
Physical Progress
0
Financial Progress
0
View on Google Map
Project Name

Construction of stalls at Panchmore including pucca drain & renovation of Netaji Park at Ward No 6, Dhubri under 15th FC Untied Grant for the year 2021-22 (2nd Instl.) during the year 2022-23.

Amount
₹14,76,000.00
Ward Name
6
Physical Progress
0
Financial Progress
0
View on Google Map